|
|
Type: Combined Heavy Lift / Pipelay Vessel
Design: Customised Seabarge 3000 class, Ulstein Sea of Solutions BV
Positioning system: 10-point mooring system provisional future DP3 system
Propulsion thrusters: 2 X 2400 KW
Retractable thrusters: 5 X 2400 kW (future)
Tunnel thruster: 1 X 1250 kW
Main Generator sets:
3 X 2600 kW(initial)
3 or 6 X 4300 kW (future)
Main crane:
AmClyde Heavy Lift Post Crane
3000 sT fixed over stern at 31 metres
2200 sT fully revolving at 31 metres
Accommodation: 290 persons.
Pipelay equipment:
TensionersA&R winchBevel machinesWelding and NDT stationsLine up tablesPipe rollers and conveyorsOverhead gantry cranesGantry/pipe handling cranesPipe elevatorPipe repair davits