|
|
Target was rebuilt from crude oil tanker Front Target at 2008. The works were carried out at COSCO shipyard in Nantong. A new midsection was fitted to the bow and aft sections of the single-hull tanker. Submerible Depth above Deck: 9.00 mFree Deck Length: 130.00 mFree Deck Area: 5785 m2